21 авг. 2024 г. · “We're developing an interim solution to return gate No. 3 — which was discovered to have steel defects in April 2024 — to limited use,” USACE ... |
11 окт. 2024 г. · Photo of one of the spillway gates and its components (girders, upper and lower leaves) at Albeni Falls Dam. |
9 окт. 2024 г. · The replacement effort could take no fewer than four years and up to seven or even 10 years to conclude the entire project. |
5 авг. 2024 г. · The dam's spillway gates were fabricated at the same time, with the same steel type, when the dam was constructed in 1955. Therefore, USACE is ... |
7 июн. 2024 г. · The meeting, held by U.S. Army Corps of Engineers, was prompted by the April discovery of defects on spillway Gate 3 at the dam. |