Prior to installation, unpack the valve trim and inspect it for damage. Return it to the carton until installation. ❑ Observe all local plumbing and ... |
The trim design illustrated in this guide is representative and may differ from the actual trim being installed. Install the trim as instructed. Kohler Co. |
The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure-balanced valve according to instructions. |
Novbeti > |
Axtarisha Qayit Anarim.Az Anarim.Az Sayt Rehberliyi ile Elaqe Saytdan Istifade Qaydalari Anarim.Az 2004-2023 |