Elevators are subject to a Category 1 test, and the DOB will require an ELV3 Elevator Inspection/Test Report. Some lifting equipment is also subject to a ... |
7 дек. 2015 г. · The Certificate of Compliance may only be issued after the submission of a satisfactory report of inspection and testing of such equipment. |
Equipment Use Permits shall be issued only after inspections and test have been performed in accordance with. 27-188 of the Building Code. INSTRUCTIONS. SECTION ... |
A permit to operate an Air Conditioning and Ventilating Equipment requires an “Equipment Use Permit” prior to operation of the machinery. |
18 нояб. 2022 г. · The NYC Department of Buildings now requires that specified service equipment cannot be operated until a Certificate of Compliance (COC) is issued by the ... |
13 авг. 2024 г. · Upon verification of the equipment information on the DOB approved plans and completion of the necessary special and progress inspections, the ... |
21 февр. 2017 г. · When an Equipment Use Permit is required, it will need to be confirmed that the nameplate information, of the equipment installed on site ... |
24 мая 2023 г. · Equipment that typically requires an EUP card includes water heaters, heat pumps, fire sprinklers, A/C units, refrigeration, and fuel storage. |
Equipment Use Permits and Certificate of Compliance are required for AC Systems, Refrigeration systems, Heat Pump Systems, Boilers, Hot Water Heaters, Heating ... |
27-186 - Application requirements. 27-187 - Inspections and tests. 27-188 - Temporary use permit. 27-189 - Exemptions from equipment use permit requirement. |